Home / Science / Environmental science / Environmental engineering / Landfill gas estimatorTool #154

Landfill gas generation estimator: methane and LFG flow by first-order decay, with collection, oxidation and CO2e

Estimate the methane and landfill gas a site makes each year from the tonnes of waste placed. Uses the first-order decay model with your decay rate k and methane potential L0. Shows the peak, the gas flow in m³/h, how much a collection system captures, the power it could make, and the methane and CO2-equivalent emitted.

Keep it one tap away for everyday use.

Bookmark Landfill gas estimator?

Press Ctrl + D now. Your browser opens its own bookmark box, where you choose the name and folder.

  1. Tonnes
  2. Decay
  3. Methane
  4. Emissions
Nothing is uploadedWorks offline once open

Waste placed

k sets how fast the waste breaks down (wetter climates and food waste are faster); L₀ is the methane a tonne can make in total. The defaults are illustrative starting values only: use the values your regulator or reporting scheme sets for your site. Collected gas is assumed flared or used; oxidation is the share of the uncollected methane that soil bacteria in the cover turn into CO₂. Use the GWP your reporting scheme asks for. Up to 500 years of waste. The example tonnages are made up.

Gas generation

Year by year (table)
Download

What it does

Food, paper, wood and garden waste in a landfill rot without air and make landfill gas, roughly half methane and half carbon dioxide. Methane is a strong greenhouse gas, a fire and explosion risk, and a fuel worth collecting. This tool estimates how much a site makes, year by year, for as long as you like after it closes.

It uses the first-order decay model that most landfill gas and greenhouse gas reporting methods are built on. Each tonne of waste can make L₀ cubic metres of methane in total, released ever more slowly. The rate falls by the same fraction each year, set by the decay rate k. The tool adds up the contribution of every year’s waste. The yearly totals are exact, with waste placed evenly through each year, so in the end every tonne releases exactly L₀.

How to use it

  1. Waste placed: a year and the tonnes placed that year, one row per year. Paste them or open a CSV, TXT or Excel file. Years listed twice are added together.
  2. Decay rate k: how fast the waste breaks down. Wet climates and food waste mean a larger k; dry climates and wood mean a smaller one. The half-life is shown.
  3. Methane potential L₀: cubic metres of methane per tonne over the waste’s whole life.
  4. The defaults (k = 0.05 per year, L₀ = 100 m³/t) are only illustrative. Use the values your regulator or reporting scheme sets for your climate and waste type.
  5. Methane in the gas: used to turn methane into total landfill gas flow; 50 % is a common assumption.
  6. Gas volumes at: the temperature L₀ is quoted at. It sets the methane density used for tonnes.
  7. Collected and oxidised in the cover: the share of methane a gas system captures, and the share of what escapes that soil bacteria in the cover turn into CO₂.
  8. GWP: the 100-year global warming potential of methane, as your reporting scheme asks.
  9. Report year and show until: the year to summarise, and how far the table and chart run.

What you get

  • The peak year and its methane.
  • For the report year: methane in m³ and tonnes, the landfill gas flow in m³/h, the amount collected and the electrical power it could make, and the methane emitted and its CO₂ equivalent.
  • The half-life of the waste, and how much methane is still to come after the last year shown.
  • A chart of methane generated, collected and emitted, and a year-by-year table, with CSV, PDF, PNG and Word downloads.

Worked example

The made-up site took 50,000 tonnes in 2005, growing 3 % a year until it closed after 2024: 1.34 million tonnes in all. With the illustrative k = 0.05 per year and L₀ = 100 m³/t:

  • Methane peaks at 4.34 million m³ in 2025, the year after the last waste.
  • In 2026 it makes 4.13 million m³ of methane (2,957 t at 0 °C), about 943 m³/h of landfill gas at 50 % methane.
  • With no gas collection and 10 % oxidation, 2,661 t of methane is emitted, which is 71,852 t CO₂e at a GWP of 27.
  • Collecting 60 % of the methane would run about 0.98 MW of engines at 35 % efficiency.
  • The waste’s half-life is 13.9 years. About 7.3 million m³ is still to come after 2074.

Limits

The model is only as good as k, L₀ and the tonnage records. Real sites vary with moisture, temperature, cover and waste mix, so measured gas flows often differ from the estimate by tens of per cent. For a permit, a design or an emissions report, use the method and values your regulator specifies, and check the result against site measurements.

FAQs

Why does the peak come after the site closes? The newest waste is still near its fastest decay, and the older waste is still making gas. Once placement stops, generation starts to fall.

Does the tool use the 0.1-year steps of some regulatory models? No. It integrates each year exactly, which gives very similar yearly totals. Small differences against a specific agency’s tool are expected.

Is my data uploaded? No. Everything runs in your browser.

Where the numbers come from

  • First-order decay model for landfill methane: the standard approach in landfill gas and greenhouse gas reporting methods. Written by fibub from the model's equation; the yearly totals are exact integrals with waste placed evenly through each year. No tables or default values are copied from any agency's tool.
  • Methane density from the ideal gas law (molar mass 16.043 g/mol). Lower heating value of methane taken as 50.0 MJ/kg. Global warming potentials of methane (100-year) as published by the IPCC in its Fourth, Fifth and Sixth Assessment Reports, offered as choices.
  • Checked in the tests against a NumPy brute-force integration (1,000 placement slices per year) and for mass balance. The default k and L0 and the example tonnages are illustrative only.

Standard scientific values, such as constants, atomic weights and melting points, are facts found in every textbook; we name where ours were checked. If you are an author or publisher and want a value, a credit or a table changed or removed, tell us and we will act quickly.

Last updated 2026-11-09.

Change log for Landfill gas estimator

  1. Add #154 landfill gas estimator (first-order decay) Details on GitHub

Every change to fibub

Related tools

Air quality calculator #116 Convert gas concentrations between ppm, ppb, µg/m³ and mg/m³ at any temperature and pressure, and work out the US Air Quality Index (with the 2024 PM2.5 breakpoints), India's National AQI and Canada's Air Quality Health Index from your own readings. Non-detect statistics #153 Work out the mean, median, upper percentiles and an upper confidence limit for lab results that include non-detects ("<1", "ND"), even with several detection limits. Uses Kaplan–Meier, robust ROS and maximum likelihood instead of substituting half the limit, compares every method side by side, and counts results above a guideline. Tree carbon calculator #161 Estimate the carbon and CO₂ stored in trees, and how much they take up each year. Enter each tree's trunk diameter (DBH) and height, an allometric equation for your species, a root-to-shoot ratio and a carbon fraction. See biomass, carbon, CO₂e for every tree and in total, and yearly uptake from two measurements or a growth rate. Detention pond router #155 Size a stormwater detention pond. Build the inflow with the modified rational method or paste a hydrograph, set the pond shape, orifice and overflow weir, and route the storm through it. See the peak outflow, how much it is cut, the highest water level, storage used and drain time. The tool can also find the orifice size that meets a target peak outflow. Life cycle comparison (LCA lite) #162 Compare two products, such as a reusable and a single-use one, across life stages (materials, manufacturing, transport, use, end of life) with your own emission factors. See the totals for any number of uses, the break-even point, a stacked bar by stage, which input would flip the result, and how sure the answer is when the factors are uncertain. Activated sludge sizer #157 Size an activated sludge aeration tank for BOD removal. Give the flow, influent BOD, sludge age (SRT), MLSS and kinetic coefficients, and see the effluent BOD, tank volume and detention time, F/M ratio, sludge production, oxygen demand, air flow, return and waste sludge flows, and how they all change with sludge age. Unit hydrograph builder #149 Build a unit hydrograph for a catchment from its area and time of concentration (a gamma curve with a peak rate factor, as in the SCS method, or a Nash cascade). Turn a series of excess rain into a storm hydrograph by convolution. Or derive the unit hydrograph from a storm you measured, with baseflow separation, a φ-index loss and a non-negative least-squares fit.