How many soil moisture samples a field really needs, by scale

A 2023 study measured soil moisture at six nested scales and published the sample numbers it says give 10 % accuracy. We recheck every one with fibub's field sampling planner: at 160 m its 42 samples buy ±24 %, not ±10 %.

Satellite soil moisture products are checked against people with probes in a field, and the first question any such campaign faces is how many probe readings one pixel needs. Too few and the “ground truth” is noisier than the satellite; too many and the field dries out before you finish. A 2023 paper in Atmosphere measured soil moisture at six nested scales, from a 2 m square up to 160 m, and published a reasonable sample number for each. This article rechecks every one of those numbers with the field sampling planner, which holds the same classical sample-size formula, and finds the agreement is excellent at small scales and breaks down at large ones. For the steps either side, size a survey of any variable with the sample size and handle readings that fall below an instrument’s detection limit with the non-detect statistics.

The paper in brief

The authors worked a flat field in Hengshui, Hebei, on 20 and 21 July 2018, measuring volumetric soil moisture in the top 20 cm on a nested grid: a basic unit of 0.4 m, 25 of those in a 2 m cell, then 10, 20, 40, 80 and 160 m blocks. From the readings they worked out the coefficient of variation (CV, the standard deviation divided by the mean) at each scale: 0.074 at 2 m, 0.109 at 10 m, 0.110 at 20 m, 0.197 at 40 m, 0.350 at 80 m and 0.778 at 160 m. Soil moisture is far patchier over a hundred metres than over two, which is the physical heart of the paper.

They then asked how many samples each scale needs for the mean to be accurate, and reported 2, 5, 5, 8, 20 and 42 samples at 95 % confidence and 10 % relative error. They fitted two rules to those numbers: Rn = 55.10 × CV from the variability, and Rn = 0.265 × √A from the area, each with R² 0.98, and validated the area rule at two further blocks (14 samples at 60 m, 33 at 120 m). Their own comparison table shows that at the 2 m scale a “traditional” statistical calculation asks for 13 samples at 95 % confidence and 10 % error, while their stratified method asks for 7.

Checked with the tools

The field sampling planner’s Estimating the average mode solves the textbook relation

n = ( t(1 − α/2, n − 1) × CV ÷ relative error )²

by iteration, because the Student-t multiplier itself depends on n. Nothing here is simulated: we fed the paper’s own published CV for each scale into that function, with its own 10 % margin and 95 % confidence.

Step 1: the small scales agree. At 2 m (CV 0.074) the planner asks for 3 samples where the paper takes 2; at 10 m and 20 m (CV 0.109 and 0.110) it asks for 7 where the paper takes 5. Those are the same ballpark, and the paper’s stratified scheme is meant to beat simple random sampling, so coming in a little lower is exactly what it claims.

Step 2: the large scales do not. At 40 m the planner asks for 18 against the paper’s 8; at 80 m, 50 against 20; at 160 m, 235 against 42. The reason is visible in Figure 1: the classical requirement grows with the square of the CV, while the paper’s fitted rule Rn = 55.10 × CV grows in proportion to it. The two agree near CV 0.11 — which is where four of the six scales sit — and separate quickly above it.

Samples for a mean within ±10 % (95 % confidence)Samples for a mean within ±10 % (95 % confidence)123510205010020040000.20.40.60.8Coefficient of variationSamples needed (log)fibub planner (classical)Paper, Rn = 55.10 × CVPaper, measured scalesfibub.com
Figure 1. Samples needed to pin a mean within ±10 % at 95 % confidence, against the coefficient of variation, from the Field sampling planner’s own function. The dashed line is the paper’s fitted rule Rn = 55.10 × CV and the dots are its six measured scales. Classical theory rises with the square of CV, so the two rules part company above CV 0.15.

Step 3: what the published numbers actually buy. Turning the formula around is more useful than arguing about it. With the paper’s own CV and its own sample number, the margin of error is t(0.975, n − 1) × CV ÷ √n. Figure 2 shows the result: ±13.5 % at 10 m, ±16.5 % at 40 m, ±16.4 % at 80 m and ±24.2 % at 160 m. Every scale is wider than the ±10 % the numbers are labelled with, and the 2 m case is a trap: with n = 2 the t multiplier is 12.71, so two samples give ±66 % whatever the CV. Three is the smallest number that can honestly be called a 10 % estimate here.

What the paper’s sample numbers really deliverWhat the paper’s sample numbers really deliver0204060050100150Sampling scale (m)Margin of error (± % of mean)Margin from the paper’s nThe ±10 % they aimed atfibub.com
Figure 2. The margin of error the paper’s own sample numbers buy at each scale (t × CV ÷ √n with its published CV), against the ±10 % it aimed at. Worked out by us from the paper’s stated values, not a figure from the paper.
Scale Paper’s CV Paper’s samples Planner, ±10 % at 95 % Margin the paper’s number gives
2 m 0.074 2 3 ±66.5 %
10 m 0.109 5 7 ±13.5 %
20 m 0.110 5 7 ±13.7 %
40 m 0.197 8 18 ±16.5 %
80 m 0.350 20 50 ±16.4 %
160 m 0.778 42 235 ±24.2 %

Step 4: the layout side. The planner also turns a sample number into a grid. Spreading 42 points evenly over a 160 m square needs a 24.7 m square grid; the 235 the classical formula asks for would need 10.4 m. The paper’s own measurement grid was 55 m square at 5 m spacing, which is about 144 nodes, far more than any of these numbers — so at the field scale they measured, nothing was undersampled. The gap only matters for the recommendation the paper hands to the next campaign.

Step 5: patches, not averages. If the goal is to catch a wet or dry patch rather than to average the field, the planner’s hot-spot mode answers a different question: a 5 m square grid has a 95.1 % chance of putting a node inside any round patch 3 m in radius, and is certain to catch one of 4 m. Going the other way, catching a 10 m patch with 95 % certainty allows a spacing of up to 16.7 m.

How we made the graphs

Both charts and every number above come from scripts/blog-figures/soil-moisture-sampling-number-scale-cv-relative-error.mjs in fibub’s public code. It calls nForMean, spacingForN, hotspotP and spacingFor from src/lib/sci/sampling.ts, the maths behind the field sampling planner, and tInv from src/lib/sci/stats.ts for the margin-of-error step.

Every input is a value the paper states in its text or tables: the six scales, the six coefficients of variation, the six sample numbers, the 10 % margin, the 95 % confidence level, the fitted rule Rn = 55.10 × CV and the 55 m × 55 m measurement grid. The hot-spot radii in Step 5 are our choice of illustration; nothing is simulated, and no figure or table from the paper is reproduced.

How we test the maths

Until this article the planner’s maths was pinned only inside tests/sci.mjs; it now has its own file, tests/sci-tools/field-sampling-planner.mjs, which runs on every change to fibub:

  • A coefficient of variation of 0.30 with a ±10 % margin at 95 % confidence must give 37 samples, and ±5 % must give 141 — the iterated t solution, not the one-shot normal answer.
  • The paper’s six coefficients of variation must give 3, 7, 7, 18, 50 and 235 samples, and the margin implied by its own 2, 5, 5, 8, 20 and 42 samples must be 66.5, 13.5, 13.7, 16.5, 16.4 and 24.2 %.
  • A square grid at a spacing equal to the patch radius must be certain to hit the patch (probability 1), and spacingForN must put 42 nodes on a 160 m square at 24.69 m.
  • The hot-spot geometry itself is checked elsewhere in tests/sci.mjs against the area of a union of discs computed with Shapely, and the t quantiles against SciPy.

Check it yourself

On the field sampling planner page:

  1. In the How many samples card, set Set the number by to Estimating the average.
  2. Type 77.8 in Expected variability, CV (%) (the paper’s 160 m scale), 10 in Margin of error (± % of the average) and 95 in Confidence (%).
  3. It shows 235 samples. Change the CV to 11 (the 20 m scale) and it falls to 7; to 7.4 (the 2 m scale) and it falls to 3.
  4. Keep CV at 19.7 (the 40 m scale) and switch the margin to 5 %: the number jumps to 63. Halving the margin quadruples the work.
  5. Draw a 160 m square in Site boundary, one corner per row (x, y) — 0, 0, 160, 0, 160, 160, 0, 160 — set Set the number by to Giving it myself with 42 samples and Layout to Square grid. The plan comes out near a 25 m spacing; download it as GPX for a field GPS.
  6. For the patch question, set Set the number by to Finding a hot spot, Hot spot radius to 10 m and Chance of hitting it to 95 %: the widest grid spacing is about 16.7 m.

What researchers can use it for

  • Size a validation campaign for a satellite pixel: put your own CV from a pilot transect into the planner and read the sample number, with the margin it really gives.
  • Audit a published sampling rule the way we did here: ask what margin its sample number buys at its own CV, before adopting it for a different field.
  • Plan the grid, not just the count: spacingForN turns a sample number into a spacing you can walk, and the GPX download goes straight to a handheld GPS.
  • Switch goals cleanly: comparing a mean with a regulatory action level needs the power-based mode (Comparing with an action level), not the margin-of-error mode, and the planner keeps them apart.
  • Teach why variability costs quadratically: Figure 1 is the whole lesson, and students can redraw it for their own crop or contaminant in a minute.

The fine print

  • The planner’s formula assumes simple random sampling from a roughly normal population. The paper’s stratified and nested schemes should need fewer samples than that, which explains part — but not all — of the gap at 40 m and above.
  • Its CV values are averages over replicates (for example 0.073, 0.070, 0.075 and 0.076 at 2 m), so the sample numbers inherit that spread; at 40 m the two replicate CVs of 0.178 and 0.216 give 15 and 21 samples.
  • A 10 % relative margin is not the same as an absolute margin of 0.02 cm³ cm⁻³. At the paper’s mean of about 0.23 cm³ cm⁻³ they happen to be close, but on a drier day they would not be.
  • We did not re-derive the paper’s Rn values, because its raw readings are not published; we only compared them with the classical requirement at its own stated CV.

Sources

  • Wang, C., Gu, X., Wang, C., Yang, J., Lu, Y. and Chen, Z. (2023), Study on Optimal Sampling Analysis of Soil Moisture at Field Scale for Remote Sensing Applications, Atmosphere 14(1): 149, doi:10.3390/atmos14010149. Licence CC BY 4.0, checked in the Crossref record and on the MDPI article page, 2026-11-24. Values used here: nested scales of 2, 10, 20, 40, 80 and 160 m on a field at 38°3′00″ N, 115°27′54″ E (Hengshui, Hebei) on 20 to 21 July 2018; 0 to 20 cm depth; a 0.4 m basic unit and a 55 m × 55 m grid at 5 m spacing; average coefficients of variation 0.074, 0.109, 0.110, 0.197, 0.350 and 0.778; reasonable sample numbers 2, 5, 5, 8, 20 and 42 at 95 % confidence and 10 % relative error; the fitted rules Rn = 55.10 × CV and Rn = 0.265 × √A (both R² 0.98); validation values of 14 samples at 60 m and 33 at 120 m.
  • Sample size for a mean within a relative margin: the standard t-based formula n = (t(1−α/2, n−1) × CV ÷ relative error)², solved by iteration. Textbook statistics; fibub's implementation is checked against SciPy's t quantiles.

If you are an author or publisher and want a credit or a passage changed or removed, tell us and we will act quickly.

Tools in this article

Read next