Coastal detention basin: routing the 100-year storm to the pre-development peak

A 2026 study finds an urban coastal pond too small for heavier storms. We rebuild its runoff arithmetic and route the 100-year storm with fibub's detention pond router.

When farmland or forest becomes roofs and roads, the same rain runs off faster and in greater volume. A detention basin, a pond that fills in a storm and drains slowly through a small outlet, is the standard fix. A 2026 study in Frontiers in Built Environment modelled one such basin on the Virginia coast against 10-, 50- and 100-year storms and concluded that it needs to be much bigger. We check the runoff arithmetic in its results table and route the 100-year storm through a pond of the same outline with the detention pond router router. To work out the catchment itself, see the watershed delineation tool.

The paper in brief

The authors built a model in the US EPA’s stormwater program (SWMM) of a catchment of about 6 hectares that goes from 5 % to 70 % paved. They applied three design storms, each two hours long, and compared runoff before and after development. After development the 100-year storm’s peak runoff rises from 3.05 to 5.04 m³/s, and the runoff depth from 192.89 to 236.98 mm. The existing pond holds about 17,200 m³ and its outlet is a rectangular opening 3.81 m wide and 1.27 m high.

They then enlarged the pond (to 44,400 m³ for the 50-year storm and 55,800 m³ for the 100-year) and report outlet peaks of 2.81 and 3.51 m³/s, with the aim of bringing peaks back toward the pre-development 10-year value of 1.44 m³/s.

Checked with the tools

This is a recomputation plus a simulation with our own simplifications. We do not have the paper’s SWMM files.

Step 1: the runoff table. A runoff coefficient is the runoff depth divided by the rainfall depth. For the 50- and 100-year storms the arithmetic works: 160.53 ÷ 226.31 = 70.9 % before (paper 71.0), and 236.98 ÷ 259.08 = 91.5 % after (paper 91.5). In the 50-year row the “after” value is 204.82 ÷ 226.31 = 90.5 %, where the paper prints 90.3. The 10-year row mixes two rainfall depths: the before-development coefficient of 60.5 % matches the table’s 162.31 mm (98.30 ÷ 162.31 = 60.6), but the after-development 86.6 % only matches 160.53 mm, the depth in the text (138.94 ÷ 160.53 = 86.6). With 162.31 mm it would be 85.6 %. Since 160.53 is also the 50-year before-development runoff depth, we think the text’s 10-year rainfall is a slip. In volume, the 6 ha catchment produces 5,898 m³ before and 8,336 m³ after the 10-year storm, and 11,573 and 14,219 m³ for the 100-year storm.

Step 2: a pond of the same outline. The paper’s outline of 158.03 × 81.84 m and a depth of 1.40 m would hold 18,100 m³ with vertical walls. Giving the pond sloping sides of about 1.96 horizontal per 1 vertical (our assumption that the outline is the water’s edge at 1.40 m) reproduces the stated 17,200 m³ exactly: a bottom of 152.5 × 76.4 m. The enlarged ponds’ storage divided by their outlines gives depths of 2.25 and 2.80 m.

Step 3: route the storm. We built the inflow as a triangle that peaks at the paper’s post-development peak (5.04 m³/s) one hour into the storm, and whose total volume equals the runoff depth times the catchment (14,219 m³). The shape, and the one-hour peak time, are our assumptions; the paper’s own hydrograph is only in a figure. We assumed a round orifice at the bottom with a coefficient of 0.6 and asked the tool for the size that holds the peak outflow to 1.44 m³/s.

For the 100-year storm that is an orifice of 1.05 m. The water rises to 0.92 m, storing 11,042 m³, about two thirds of the pond’s 17,200 m³, and the peak leaves 24 minutes after the inflow peak. For the 50-year storm the orifice is 1.39 m and the storage 9,408 m³. For the 10-year storm a 2.59 m orifice is enough, with only 5,455 m³ stored.

100-year storm through the existing pond100-year storm through the existing pond0246050100150200Minutes from the start of the stormFlow (m³/s)pre-development 1.44Inflow (assumed shape)Outflow, orifice sized for 1.44fibub.com
Figure 1. The 100-year post-development storm, routed through a pond of the paper's outline (our assumptions: triangular inflow peaking at 60 minutes, side slope chosen to hold 17,200 m³, a round orifice with coefficient 0.6 at the pond bottom). Not the paper's own model.

Step 4: how sensitive is the peak to the outlet? With a 3 m round orifice, the widest the tool tries, the 100-year peak is still only 2.85 m³/s, below the 3.51 the paper reports for its enlarged pond. The routed peak falls as the orifice shrinks and crosses 1.44 near 1.05 m (Figure 2).

Peak outflow against orifice size, 100-year stormPeak outflow against orifice size, 100-year storm0123450.511.52Round orifice diameter (m)Peak outflow (m³/s)target 1.44paper: 3.51fibub.com
Figure 2. How the routed peak falls as the orifice grows, for the same storm and pond.
Check Paper Tool gives
100-year runoff coefficient after development 91.5 % 91.5 % (236.98 ÷ 259.08)
10-year coefficient after development 86.6 % 85.6 % with 162.31 mm, 86.6 % with 160.53 mm
Existing pond volume about 17,200 m³ 17,200 m³ with sides of 1.96:1 (our assumption)
100-year runoff volume after development not stated 14,219 m³
Existing pond, 100-year storm held to 1.44 m³/s enlarged to 55,800 m³ 11,042 m³ stored, 0.92 m deep

The last row is a difference we cannot explain from the paper’s text. An ideal pond with a sized outlet seems to need about a fifth of the paper’s enlarged volume. Possible reasons: the paper’s catchment may include more than the 6 ha (its text says 0.06 km² but also gives an average width of 393 m), its outlet discharge coefficient of 5.22 and a channel downstream may restrict flow, tidal tailwater may hold water in the pond, and SWMM’s dynamic routing differs from a simple level-pool. We flag the gap rather than call it an error.

How we made the graphs

The script scripts/blog-figures/coastal-detention-basin-orifice-routing-100-year-post-development-peak.mjs calls storageAt (volume of a sloping-sided pond), tableHydro (a pasted hydrograph), route (level-pool routing) and sizeOrifice (the orifice for a target peak) from src/lib/sci/pond.ts, the maths of the detention pond router router. The runoff depths, peaks, catchment area, outline, depth and stated storage are from the paper. The triangular inflow shape, its one-hour peak, the 1.96:1 side slope, the round orifice with coefficient 0.6 at the bottom and the 1.44 m³/s target are our assumptions or choices. The curves are simulated, not the paper’s.

How we test the maths

On every change, tests/sci.mjs runs tests/sci-tools/detention-pond.mjs, new with this article:

  • The pond’s storage at 1.40 m for a 152.5 × 76.4 m bottom and 1.958:1 sides must be 17,200 m³, and the integral of the surface area must give the same.
  • A triangular hydrograph through points (0, 0), (60 min, 5.04) and (94.04 min, 0) must carry 14,219 m³.
  • The sized orifice (1.051 m) must route that storm to a peak of 1.44 m³/s with water at 0.92 m.

The older checks in tests/sci.mjs compare routing with SciPy’s solver to about 1 part in 500,000.

Check it yourself

On the detention pond router page:

  1. Under Inflow, set Inflow from to A hydrograph I paste and paste three rows: 0, 0; 60, 5.04; 94.04, 0 (time in minutes, flow in m³/s).
  2. Under Pond and outlet, set Bottom length (m) to 152.5, Bottom width (m) to 76.4, Side slope to 1.958, Depth to the top of the bank (m) to 1.4.
  3. Set Orifice diameter (m) to 1.051, Orifice coefficient to 0.6, Overflow weir crest above the bottom (m) to 1.4, Overflow weir length (m) to 3.81 and Weir coefficient to 1.7.
  4. The peak outflow should read about 1.44 m³/s, the highest water about 0.92 m, and the storage about 11,000 m³.
  5. Type 1.44 in Target peak outflow to see the tool find an orifice of about 1.05 m by itself, then change the orifice to 0.8 and watch the peak fall and the water rise.

What researchers can use it for

  • Sanity-checking a pond study: does the stated storage fit the outline and depth, and does the volume exceed the runoff?
  • Scoping before a full model: size an outlet with level-pool routing, then confirm in SWMM.
  • Comparing storms: route the 10-, 50- and 100-year events through the same pond to see which one controls the design.
  • Teaching the link between runoff coefficient, volume, peak and storage.
  • Checking a table: divide each runoff depth by its rainfall, as in Step 1, to catch a typo.

The fine print

  • Our inflow is a made-up triangle with the right peak and volume, not the paper’s SWMM hydrograph.
  • The tool routes level-pool storage with a round orifice and weir. It ignores tidal tailwater, channel losses and the paper’s rectangular outlet with coefficient 5.22.
  • The 1.96:1 side slope is inferred so that storage matches the paper’s 17,200 m³; the paper’s own figure 7 gives 18,000 m³.
  • The difference in storage we find may come from the model differences above. It is not a claim that the paper is wrong.

Sources

  • Chathuranika, I. M., Asante, A., Borhani, F., Wang, X., Erten-Unal, M. and Ismael, D. (2026), Performance assessment and design improvements for an urban coastal detention basin under intensifying rainfall extremes, Frontiers in Built Environment 12, doi:10.3389/fbuil.2026.1731955. Licence CC BY 4.0, checked in the Crossref record (no correction or retraction), 2026-11-24. Values used here: catchment about 0.06 km2 (6 ha), impervious cover 5 % before and 70 % after development; 2-h design storms for Norfolk, Virginia; total rainfall 162.31 (table; the text says 160.53), 226.31 and 259.08 mm; runoff depths before and after development 98.30 / 138.94, 160.53 / 204.82 and 192.89 / 236.98 mm; post-development peaks 3.16, 4.49 and 5.04 m3/s; pre-development 10-year peak 1.44 m3/s; pond outline 158.03 x 81.84 m, maximum depth 1.40 m, stated maximum storage about 17,200 m3; modified storage 44,400 m3 (50-year) and 55,800 m3 (100-year) with outlines 200.57 x 98.18 and 201.23 x 99.21 m. Peaks in the paper come from US EPA SWMM 5.0.
  • Level-pool routing, orifice and weir equations: standard hydraulics, as implemented in the fibub tool (see its guide).